Site Summaries | Table of Contents

Table 2. Leg 205 Site Time Estimate for Alternate Sites.

Site
No.
Location
Lat./Long.
Water
Depth
Operations Description Transit
(days)
On-Site
(days)
 
1040R-D
Fluid Conduit
9.66°N 4177 Set reentry cone w/ 60 m 16" casing   7.1
86.18°W m Set 10-3/4" casing to 185 mbsf
      Install osmo-sampler screen @ 200 mbsf w/ packer @ 195 mbsf
      Install osmo-sampler
      Deploy ROV/submersible platform
 
1043R 9.65°N 4313 Set reentry cone w/ 60 m 16" casing   7.1
86.19°W m Set 10-3/4" casing to 185 mbsf
      Install osmo-sampler screen @ 200 mbsf w/ packer @ 195 mbsf
      Install osmo-sampler
      Deploy ROV/submersible platform
 
Alternate Site Transit and On-Site Time Totals: 0.0 14.2
 
ALTERNATE SITE OPERATIONAL DAYS TOTAL: 14.2

Site Summaries| Table of Contents