Downhole Measurements Laboratory |
Staff Liaison: Adam Klaus |
Adara experienced delays in the delivery of some components and is behind schedule. The tools are expected to be delivered to ODP/TAMU by mid-April. Pending their successful testing and evaluation at ODP/TAMU, they will be delivered to the ship, probably in time for Leg 168.
Three new probe tips were fabricated and delivered to the ship to replace the two tips damaged during Leg 164.