Technical Note 20/4
LEG 175 PROSPECTUS
Table 1. Proposed Site Information and Drilling Strategy
SITE: NAB-1 PRIORITY: POSITION: 5°3.6'S, 11°6.6'E
WATER DEPTH: 1397 m SEDIMENT THICKNESS: >500 m TOTAL PENETRATION: 400 m
SEISMIC COVERAGE: GeoB 2301
Objectives: Paleoproductivity/environmental record of fan margin deposits
Drilling Program: APC/XCB
Logging and Downhole Operations: Quad combo, GLT
Nature of Rock Anticipated: Hemipelagic foram and diatom bearing muds
SITE: NAB-4 PRIORITY: POSITION: 4°46.8'S, 10°4.8'E
WATER DEPTH: 3001 m SEDIMENT THICKNESS: 600 m TOTAL PENETRATION: 600 m
SEISMIC COVERAGE: GeoB 93-002
Objectives: Paleoproductivity/environmental record of fan margin deposits;
most distal location to Congo Canyon
Drilling Program: APC/XCB
Logging and Downhole Operations: Quad combo, GLT
Nature of Rock Anticipated: Hemipelagic foram and diatom bearing muds
SITE: MAB-1 PRIORITY: POSITION: 11°54'S, 13°21.6'E
WATER DEPTH: 550 m SEDIMENT THICKNESS: >500 m TOTAL PENETRATION: 400 m
SEISMIC COVERAGE: GeoB 93-015, GeoB 93-018
Objectives: Continental margin sedimentation; paleoproductivity
Drilling Program: APC/XCB
Logging and Downhole Operations: Quad combo, GLT
Nature of Rock Anticipated: Hemipelagic foram and diatom bearing muds
SITE: MAB-3 PRIORITY: POSITION: 11°54'S, 13°7.2'E
WATER DEPTH: 1178 m SEDIMENT THICKNESS: >500 m TOTAL PENETRATION: 400 m
SEISMIC COVERAGE: GeoB 93-015, GeoB 93-022
Objectives: Continental margin sedimentation; paleoproductivity
Drilling Program: APC/XCB
Logging and Downhole Operations: Quad combo, GLT
Nature of Rock Anticipated: Hemipelagic foram and diatom bearing muds
SITE: MAB-5A PRIORITY: POSITION: 11°58.2'S, 12°53.4'E
WATER DEPTH: 1159 m SEDIMENT THICKNESS: >1000 m TOTAL PENETRATION: 600 m
SEISMIC COVERAGE: GeoB 93-015, GeoB 93-028
Objectives: Continental margin sedimentation; paleoproductivity
Drilling Program: APC/XCB
Logging and Downhole Operations: Quad combo, GLT
Nature of Rock Anticipated: Hemipelagic foram and diatom bearing muds
SITE: SAB-2 PRIORITY: POSITION: 11°33.6'S, 10°49.2'E
WATER DEPTH: 2770 m SEDIMENT THICKNESS: >1000 m TOTAL PENETRATION: 600 m
SEISMIC COVERAGE: GeoB 93-030, GeoB 93-033
Objectives: Paleoproductivity - upwelling history; relationship to current systems
Drilling Program: APC/XCB
Logging and Downhole Operations: Quad combo, GLT, GHMT, FMS
Nature of Rock Anticipated: Hemipelagic foram and diatom bearing muds
SITE: WR-1 PRIORITY: POSITION: 11°33.6'S, 10°49.2'E
WATER DEPTH: 750 m SEDIMENT THICKNESS: 1200m TOTAL PENETRATION: 600 m
SEISMIC COVERAGE:
Objectives: History of Benguela Current
Drilling Program: APC/XCB
Logging and Downhole Operations: Quad combo, GLT
Nature of Rock Anticipated: Nannofossil ooze and chalk
SITE: NCB-2 PRIORITY: POSITION: 25°30'S, 13°4.8'E
WATER DEPTH: 1850 m SEDIMENT THICKNESS: 2000 m TOTAL PENETRATION: 600 m
SEISMIC COVERAGE: GeoB 93-044, MCS line AM-1
Objectives: History of Benguela Current
Drilling Program: APC/XCB
Logging and Downhole Operations: Quad combo, GLT
Nature of Rock Anticipated: Nannofossil ooze and chalk
SITE: SCB-1 PRIORITY: POSITION: 31°24'S, 15°16.8'E
WATER DEPTH: 1350 m SEDIMENT THICKNESS: 3800 m TOTAL PENETRATION: 600 m
SEISMIC COVERAGE: MCS line AM-54
Objectives: History of Benguela Current
Drilling Program: APC/XCB
Logging and Downhole Operations: Quad combo, GLT, GHMT, FMS
Nature of Rock Anticipated: Nannofossil ooze and chalk
To Leg 176
Table of Contents
Publications Home
ODP Home