Thumbnails

F1-19
F20-39
T1-4
M1

T1. Coring summary for Sites 1100, 1102, and 1103.

T2. Summary of gas concentrations for Hole 1103A.

T3. Profiles of interstitial water chemistry at Hole 1100C.

T4. Summary of logging operations.

M1. QuickTime video (shelf seabed camera survey, Site 1102).

F1-19
F20-39
T1-4
M1