Figures F1-F20
Tables T1-T6

F1. Bathymetry map of Inutil Seamount.

F2. Echo-sounder profile over Site 1180.

F3. Echo-sounder profile over Site 1181.

F4. Bathymetry map of Martillo Seamount.

F5. Echo-sounder profile over Site 1182.

F6. Hard-rock reentry system deployment.

F7. Running tool release after casing is drilled to depth.

F8. Hard-rock reentry system setup.

F9. SDS Digger Tools 260 fluid hammer.

F10. SDS 260 fluid hammer and test bit configurations.

F11. SDS modified top sub with centralizer pads.

F12. SDS modified jet sub.

F13. Profile of the dual cam underreamer bit.

F14. Side view of the dual cam underreamer bit with arms open.

F15. Pilot shank of the dual cam underreamer bit.

F16. Dual cam underreamer bit in the open position.

F17. Dual cam underreamer bit in the closed position.

F18. Three-level flat-face underreamer pilot bit.

F19. Three-level flat-face underreamer bit.

F20. Pulsation sub.

Tables T1-T6

T1. Operations summary, Sites 1180 and 1181.

T2. Drilling summary, Site 1182.

T3. Breakdown on HRRS activities.

T4. HRRS operation summary, Sites 1180 and 1181.

T5. HRRS operation summary, Site 1182.

T6. Drilling rates, Site 1182.

Figures F1-F20
Tables T1-T6