Figure F5. Section of Ewing line 2MCS showing proposed drill Sites NNB-01A, NNB-01B, NNB-01C, NNB-03A, and NNB-04A. Locations are shown in Figure F3. Crossing profiles are shown in Figures F7 and F8. Arrows at the bottom indicate depths of basement picks. Holes are planned for at least 100-m basement penetration. CMP = common midpoint.