PREPARATION FOR H2S OPERATIONS
H2S Monitoring Responsibilities
Opening the Drill String on the Drill Floor
Removing Core from Core Barrel on the Drill Floor
Core Processing on the Core-Receiving Platform
Core Processing in the Core Laboratory
Handling Downhole and Logging Tools at Various Locations
SPECIAL CORING PROCEDURES FOR H2S SITES